2/5/19. Rubber crumb flooring completed in the range bays. Looking really good. |
1/5/19. Hole dug 36" down and 36" wide for 4" steel pole to be cemented in for trackman radar to be installed.
|
3/5/19. Trackman in to fit Radar to pole . Brackets being attached. |