17/11/16. 3rd bunker on Hawkshill completed . It now has a reduced face. |
 |
17/11/16 New edge all the way around. |
 |
17/11/16. New sand added. |
 |
02/11/16. During Renovation. |
 |
8/11/16 .Revetted face getting built. |
 |
17/11/16 . With lowered face it makes pin positions more visible. |
16th Greenside Bunker on Hawkshill.
 |
11/11/16 .Lowering face , first job is removal of turf. |
 |
11/11/16. Removal of soil , 12 inch taken off top. |
 |
17/11/16 . Turf laid back down. |
 |
17/11/16 . Finished bunker. |
Reinstating path surface outside club after water burst.
 |
28/11/16. 50mm concrete base being put down on top of sub base. |
 |
29/11/16 . Nearly complete |
 |
28/11/16 .Rubber crumb will be laid on top of concrete to a depth of 20mm .
Weather permitting the surface will be done on 12th December. |
 |
30/11/2016. Top box tee at the 9th Hawkshill getting levelled , Screening boards are put in . |
 |
01/12/2016 . Screening done , now ready for turfing. |
 |
02/12/16 .Turf that was taken off at beginning now being laid back down. |
 |
02/12/16 .Good to get back on the greens for a hand cut after a prolonged frost . 18th Hawkshill . |
 |
30/11/16 Bottom box tee at the 9th Hawkshill , getting levels put in. |
 |
30/11/16 This tee was the worst one out of the four box tees at the 9th.
|
 |
21/11/16 Tree felling . Invasive Fir trees which were killing of the Scots Pines and Birch , were taken down. |
5th Hawkshill
 |
30/11/16 .Tree plantations getting thinned out to the right of 5th tee , this will aid air movement. |
 |
6/12/16 . Making up winter tee markers for Hawkshill. The log markers we have on course will be taken in to get varnished . |
 |
6/12/16 . 18th bunker on Hawkshill . Away to get a new edge put in and slightly re modified . |
 |
6/12/16 .8th greenside bunker on Hawkshill getting new edge put in . |
 |
6/12/16. A firm base is required for the turf wall to be built , so all sand on the new edge has to be removed.
|
 |
7/12/16 . 4th tee on Swailend . Turf removal . |
 |
7/12/16 .Turf removed and now ready for the digger work to begin. |
 |
8/12/16 .Digger on 4th tee Swailend putting in a irrigation track. |