23/2/18. Pump in to take out water from pond at the 9th Hawkshill.
23/2/18. The collapsed wall can be seen in the distance . Builder due in on Monday the 26th , so just getting ahead of the game .
21/2/18. Staff hard at it working on the drains at the 18th hole on Swailend .
22/2/18. Satff are working on the fairway area first.
22/2/18. Edging the drains , then soil/sand mix put down and finally turf laid on top .
15/2/18. 11th Green on Hawkshill . Not what I like to see in mid February with thick ice lying on a green .With ground frozen underneath and then the rain freezing on the top of that it creates this picture . all I can say to this is roll on the Summer.
 |