16/11/18. The two 50 yard greens are done, now onto the first 75yd target green.
16/11/18. Greens looking great , single cut done today.


15/11/18. Bankings being turfed , first 50 yard green now completed.
15/11/18. Thin covering of sand is put down levelled out and now turf is being laid.
14.11.18. Topsoil now on top of the sub soil , this is raked out tramped and stones removed.   
12/11/18. Soil for target  greens coming out of our 10th quarry on Hawkshill . Total of 5,500 ton of soil carted up . 
13/11/18. Some greens are starting to show up nicely.



6/11/18. Foundation soil getting placed on location of new target greens.




5/11/18. Removing turf from range where target greens are going.

5/11/18. New range in the background coming on.

5/11/18. A lot of work removing all the turf from the green areas , but this will save money as turf will be put back onto bankings around new greens.

5/11/18. Just a picture as we start with greens for driving range.