Friday 3 May 2019

May 2019

2/5/19. Rubber crumb flooring completed in the range bays. Looking really good.

1/5/19. Hole dug 36" down and 36" wide for 4" steel pole to be cemented in for trackman radar to be installed.

3/5/19. Trackman in to fit Radar to pole . Brackets being attached.

No comments:

Post a Comment