All the Greenstaff  would like to wish the members a very Merry Christmas 🎄 and a Happy New Year 🎉. Hope 2017 is a good one for you's all 🏌
22/12/16. 4th tee on Swailend  , Main drain has been put in down side of tee with laterials going onto tee . Then a bed of gravel has been put down to assist with drainage , Just the rootzone to be carted in now .
15/12/16. Main drain getting installed on 4th tee on Swailend.
8/12/16. Irrigation getting laid along outside edge of tee (4th tee Swailend). 
8/12/16. Just a few boulders that were taken out of tee during renovation.
14/12/16. Laterals on the 4th tee Swailend getting dug out .

22/12/16 . Swailend 4th tee has been a major project but its all coming together now.




28/12/16. Picture taken at 08.30am (4th Hawkshill)
28/12/16.  -1oc This morning