16/1/17. 12th tee Hawkshill . Turf removed and soil removed .

16/1/17. Once soil has been removed the sub soil will be moved around and levelled to create new base for tee. 
16/1/17. The narrow part of tee will be filled in to create a more rectangled tee shape.

16/1/17. 5 inches of soil was removed to reveal a solid sub soil which as you can see from the picture wouldn't let much water pass through it . Also root depth was severely restricted due to this. .